            officials and political leaders. It is not surprising that   in the inner city, which is easier to lease for profitable
            state enterprises, occupying land in inner Shanghai —   use compared with land in less favorable locations. In
            where land value has significantly multiplied in the past   addition, the size of the land plot also plays a role in land
            decades and is expected to continue increasing — are   profitability. A  small piece of land is less profitable for
            often reluctant to relinquish their land rights. As long as   leasing compared to a large-sized land plot. For instance,
            the state enterprise does not agree to relinquish its land   the Shanghai Medicine Group, which controlled 54 small,
            rights, the implementation of the land use plan has to be   distributed pieces of industrial land, intended to acquire a
            suspended. Unless significant public interests are involved,   large piece of land in Shanghai’s satellite towns to relocate
            such as public infrastructure or projects with national or   their factory in exchange for the 54 inner-city industrial
            municipal significance (Ren, 2014), state enterprises tend   land pieces. However, the government did not favor this
            to hold onto the land for their own uses.          plan as the small, distributed pieces of land were not

              The dilemma of land acquisition has been taken into   profitable enough to lease (Interview in October 2019).
            consideration by the local government when making   Studies on redevelopment projects in Shenzhen have also
            a plan. A land use plan needs to balance the proportion   shown that urban sites with high land rent gap levels and
            of various land uses, such as commercial and non-  low transaction costs are more likely to be redeveloped
            commercial land use, to obtain approval from the upper   earlier (Lai  et  al., 2021). This implies that the local
            government. The local government tends to use the land   government is selective in choosing parcels of industrial
            it occupies to plan for projects that generate land revenue.   land for redevelopment while leaving others suspended or
            Meanwhile, land occupied by state enterprises is planned   awaiting future opportunities.
            for non-commercial purposes. This approach ensures that   However, for the industrial land that is not yet in the
            the proportion between commercial and non-commercial   forthcoming implementation agenda, there is a market-
            land use is balanced and aligns with planning guidelines.   driven,  bottom-up  motivation  for  redevelopment.  On
            For instance, in Baoshan District, Shanghai, land occupied   the land supply side, original manufacturing production
            by state enterprises — which is less likely to be retrieved   activities have been terminated or reduced, leaving
            by the  local  government for  profitable uses  — is largely   industrial buildings idle  and providing potential  space
            planned for non-commercial uses such as green open   for new uses. On the land demand side, potential tenants
            space (Xia, 2017, p. 209).                         require more space for emerging businesses. The situation
                                                               sets the stage for an alternative form of redevelopment
              Due to the various ownerships of industrial land, land
            transactions have become challenging for implementing the   beyond the planning-led approach.
            land redevelopment plan. Furthermore, even for industrial   5.2. The underpinning rationales of legitimating the
            land occupied by the local government, redevelopment   practice-led approach
            activities may stagnate despite the approval of plans. The
            government will need to take steps to implement the plan   The afore-described practice-led industrial redevelopment
            in a top-down approach. The latest Shanghai Master Plan   approach emerged and gained support from the local
            was developed in 2015 and approved in 2018, serving as   government for multiple reasons. It can be seen as
            the future scheme of urban development in 2035. However,   a consequence of interactions among different local
            this does not mean that all the land will be transformed   authorities and agencies within the specific institutional
            from its current use to the planned use all at once. The   environment.
            implementation of the plan is a long-term process, with   First, the current planning system does not provide
            some  urban  sites  redeveloped  earlier  than  others.  The   adequate solutions for industrial land retrieval, leading
            decision on which sites to implement first is subject to   to land redevelopment being suspended for extended
            internal and external social and economic circumstances,   periods. In response to this issue, the introduction of
            such as location factors, land property rights, and land use   the “three unchanged” policy indicates that the local
            status.                                            government prioritizes immediate social and economic
              One of the main driving forces for the local government   interests over strict development control legitimacy. The
            to promote land redevelopment is to obtain the “land rent   planning authority compromises by accepting that, as long
            gap.” It is highly profitable for the local government as the   as the formal or registered land use of the land does not
            subsequent land transfer fee through land leasing is much   violate the existing zoning plans, it would remain silent on
            higher than the previous land compensation, contributing   the proposed adaptive reuse of industrial sites.
            significantly to the local budget. Driven by the concept of   Second, industrial land reuse projects still require
            the “land rent gap,” the government tends to favor land   permission from the local government. In the absence