Page 222 - AJWEP-v22i3
P. 222

Švajlenka, et al.

                                     Operating   costs                                             1.0000




                                     Realization   costs                                      1.0000  0.4545 a  0.3661 b






                                     PD   costs                                            1.0000  0.4255 a  0.4863 b  0.6766 b



                                     Quality                                         1.0000  ‑  ‑  −0.3888 a  −0.6051 b




                                     Time of   construction                     1.0000  ‑  ‑  −0.8153 a  −0.4416 b  −0.4270 a




                                     Internal   comfort                    1.0000  −0.4820 a  −0.4399 a  −0.4461 b  ‑  ‑  0.4072 a
                                 Table 2. Correlations among the selected parameters relative to the higher age groups



                                     Stability                          1.0000  ‑  ‑  0.3104 b  ‑  ‑  ‑



                                     Energy   standard            1.0000  0.3082 b  −0.4162 a  0.5188 a  0.3899 b  ‑  −0.4363 a  −0.7370 a  −0.5386 a




                                     Materials                 1.0000  ‑  ‑  0.6160 b  ‑  −0.5520 b  ‑  ‑  ‑ Notes: “–” refers to not significant;  a values represent the age group 36 – 45 years; and  b values represent the age group over 45 years.




                                     Architectural   appearance  1.0000  ‑  ‑  −0.7115 a  0.3495 b  ‑  ‑  −0.4024 b  ‑  ‑







                                     Shape   constraints  1.0000  ‑  0.7298 a  0.7857 b  ‑  ‑  0.6634 b  −0.3911 a  −0.5560 b  ‑  ‑  ‑



                                     Knowledge   of wooden   buildings  1.0000  ‑  ‑  ‑  0.6398 a  ‑  ‑  a 0.5351 a  0.4577 b  −0.3979  b  −0.5287 a  −0.3597 b  −0.4376 b






                                     Age groups  Knowledge   of wooden   buildings  Shape   constraints  Architectural   appearance  Materials  Energy   standard  Stability  Internal   comfort  Time of   construction  Quality  PD costs  Realization   costs  Operating   costs








                Volume 22 Issue 3 (2025)                       216                           doi: 10.36922/AJWEP025080047
   217   218   219   220   221   222   223   224   225   226   227