Page 222 - AJWEP-v22i3
P. 222
Švajlenka, et al.
Operating costs 1.0000
Realization costs 1.0000 0.4545 a 0.3661 b
PD costs 1.0000 0.4255 a 0.4863 b 0.6766 b
Quality 1.0000 ‑ ‑ −0.3888 a −0.6051 b
Time of construction 1.0000 ‑ ‑ −0.8153 a −0.4416 b −0.4270 a
Internal comfort 1.0000 −0.4820 a −0.4399 a −0.4461 b ‑ ‑ 0.4072 a
Table 2. Correlations among the selected parameters relative to the higher age groups
Stability 1.0000 ‑ ‑ 0.3104 b ‑ ‑ ‑
Energy standard 1.0000 0.3082 b −0.4162 a 0.5188 a 0.3899 b ‑ −0.4363 a −0.7370 a −0.5386 a
Materials 1.0000 ‑ ‑ 0.6160 b ‑ −0.5520 b ‑ ‑ ‑ Notes: “–” refers to not significant; a values represent the age group 36 – 45 years; and b values represent the age group over 45 years.
Architectural appearance 1.0000 ‑ ‑ −0.7115 a 0.3495 b ‑ ‑ −0.4024 b ‑ ‑
Shape constraints 1.0000 ‑ 0.7298 a 0.7857 b ‑ ‑ 0.6634 b −0.3911 a −0.5560 b ‑ ‑ ‑
Knowledge of wooden buildings 1.0000 ‑ ‑ ‑ 0.6398 a ‑ ‑ a 0.5351 a 0.4577 b −0.3979 b −0.5287 a −0.3597 b −0.4376 b
Age groups Knowledge of wooden buildings Shape constraints Architectural appearance Materials Energy standard Stability Internal comfort Time of construction Quality PD costs Realization costs Operating costs
Volume 22 Issue 3 (2025) 216 doi: 10.36922/AJWEP025080047