Page 39 - JCAU-4-1
P. 39

The Relocation of Zhang Fei’s Temple                                                                                              Zhu and Li


                   the Yangtze River, opposite to the             projects in China.
                   New Yunyang Town across the River              • From          the            above-mentioned
                   as before. The layout of the former            evaluations ,  the   experts    reached   a
                                                                             11
                   surroundings has been mostly respected         common   agreement  that  the  relocation
                   and thoroughly considered, embodying           project   of   General Zhang Fei’s Temple
                   the international principle that the           was a successful case on the conservation
                   conservation of a monument implies             of historic building complex. It strictly
                   preserving the traditional setting in which    adhered to the Law of Cultural Relics
                   it occurs.                                     of China and the basic principles of
                   • The former style and layout of General       international charters on conservation.
                   Zhang Fei’s Temple has been kept very          The experts agreed that the construction
                   well. A good respect for the visual            was good to pass the examination.
                   scenery around the Temple has been
                   maintained. The principle of “no change  5.    REFLECTIONS
                   to the former status” as required by the  Some thoughts on the conservational
                   law of China was strictly followed.        relocation of General Zhang Fei’s Temple:
                   • The methods used to preserve the  China has experienced the flourishing age
                   building materials during the disassembly  of Market Economy and developed rapidly
                   and transmission process were effective.  at an amazing speed, which has already
                   The reuse of old building components  impressed the whole world. The construction
                   in the restoration process were applied  of the Three Gorges Dam Project was the
                   to a great extent, especially in the  direct cause that resulted in the relocation of
                   conservation of historic carvings and  General Zhang Fei’s Temple. It was decided
                   sculptures of timber and stone.            that the emphasis of this conservation
                   • Good work in the combination of  action was on how to preserve the historic
                   restoration and reparation in this  setting of General Zhang Fei’s Temple, and
                   construction project. Although traditional  how to keep local beliefs and associated
                   construction techniques were adhered  cultural values. The decision to relocate the
                   to as a general rule, modern scientific  Temple together with the People reflects
                   techniques  and  materials  were  also  China’s modernization conservation goals,
                   implemented in a careful manner so as to  including relocating with the New Town,
                   help preserve the Temple for a long run.   keeping landscape view across the River,
                   • In the process of construction, many     and reconstructing the new site as the old
                   effective measures were taken to increase   setting. In addition, as the largest historic
                   work efficiency. A reasonable schedule     building complex protection project in
                   on the arrangement of works was created,   the Three Gorges Dam Project, General
                   detailed data on the construction were     Zhang Fei’s Temple had become the focus
                   recorded, all of which helped to ensure    of social attention from the beginning.
                   good organization and management.          The government at different levels and the
                   • Introduced the system of supervision of   media all over China drew great attention to
                   construction on the conservation project   this relocation project. Through television,
                   for the first time. Invited professional   newspapers, and the Internet, people knew
                   institutes as supervisors to monitor the   every stage and every detail of the relocation.
                   whole procedure of construction. Set new   The open process was a testament of China’s
                   management standards for conservation      development capabilities in all aspects.
                                                              Reviewing the whole project, there are some


               11  Chongqing Municipal Bureau of Cultural Relics, Chongqing Municipal Immigration Bureau, Zhanghuanhou
               Temple in Yunyang, Beijing: Cultural Relics Press, 2011, p380-p400.


               AccScience Publishing                                                                                                                                           14
   34   35   36   37   38   39   40   41   42   43   44