Page 108 - AJWEP-22-5
P. 108

Liu and Jusoh

                In contrast, recycling  units focus more  on long-term   products,  with  their  economic  sustainability
                operational feasibility, where a stable supply of waste   depending on stable supply and demand.
                and sustained market  demand are deemed  crucial.    (iii) Government departments  shape the business
                                                               35
                Consequently, when short-term profits are not evident,   environment through regulatory enforcement,
                contractors  tend  to  withdraw  from  recycling  efforts,   financial  instruments,  infrastructure  investment,
                disrupting the commercial recycling process.            and public procurement policies.
                  The second contradiction  concerns unclear
                responsibility  distribution.  Interview  findings  reveal   However, this study reveals that the aforementioned
                a clear pattern of blame-shifting among stakeholders,   functions remain fragmented. Construction units have
                resulting  in  a  circular  offset  of  responsibilities.   not received sufficient economic incentives or technical
                According to a previous study, the absence of clear   support  for  sorting,  while  recycling  enterprises  are
                primary responsibility  is one of the main reasons   more  affected  by  unstable raw material  supplies and
                why  recycling  fails  to  generate  economic  benefits.    poor market and policy coordination. Although various
                                                               36
                For instance, construction units rely on external   government measures exist, their effectiveness is limited,
                parties (recycling  companies or the government) for   often weakened through layers of implementation, and
                equipment, technology, and training support. Recycling   lacks timely and effective feedback mechanisms. This
                companies depend on the government to set mandatory   fragmented  situation  has been repeatedly  highlighted
                usage quotas for recycled products and enforce policies   in  waste  governance  studies, where  the  lack  of
                to secure  raw material  supply and resolve  sales   coordination  among stakeholders  and imbalanced
                difficulties.  Although  the  government  has  introduced   risk-sharing weakens policy effectiveness and hinders
                various support programs, limitations in coverage and   market  development. 39,40  More directly, these  issues
                implementation have been evident.                   result in market imbalance and a non-circular economy.
                  The third contradiction highlights the inconsistency   To address these challenges and ensure a smoother,
                between policy design and execution,  which often   economically  sustainable  recycling  process, it  is
                results in low efficiency in policy outcomes.  Although   essential to establish a collaborative governance model
                                                       37
                the government has invested  in subsidies, technical   between  enterprises  and the  government.  Measures
                guidance,  and training  programs,  construction  and   to enhance coordination,  such as tiered  subsidies,
                recycling  parties often display negative  attitudes  in   joint  infrastructure  investment,  and  the  establishment
                different aspects, such as complex access procedures,   of integrated governance committees,  have been
                insufficiently detailed guidelines, and low participation   suggested  in  many  previous  studies. 41,42   Specific
                rates.  This  reveals  a  gap  between  policy  design  and   approaches have also been discussed in earlier sections,
                on-the-ground  implementation.  Addressing this issue   including  providing  targeted support for construction
                should become a key direction for reforming municipal   units  (such  as tax  rebates  and  priority  approvals),
                government support policies.                        mandating public projects to procure recycled materials
                                                                    with  proper  quotas,  and  offering  performance-based
                3.5.3. Future coordination for stakeholders         subsidies to recycling enterprises to support innovation.
                This study indicates that without coordinated efforts, the   Government departments should transition to roles as
                economic value of recycling among stakeholders will   integrated  platform builders, enabling  real-time  data
                remain largely unrealized. Both interviews and literature   sharing, cross-departmental cooperation, and inclusive
                highlight  that  value  realization  depends  not  only  on   consultations.  Through these  actions,  and  under a
                improvements in technology or policy but also requires   shared framework of tripartite coordination, a circular
                collaborative  participation,  shared responsibility, and   economy becomes achievable, as illustrated in Figure 2.
                common incentives among stakeholders. 38               These models have shown positive results in other
                An analysis of the roles within the recycling  value   countries  with well-developed  circular  economies.
                chain reveals that each stakeholder holds a critical yet   For example, the Netherlands has established tripartite
                incomplete position, and an effective connection among   partnerships  among  contractors,  recyclers,  and
                them is essential:                                  government departments through coordinated incentives,
                (i)  Construction  units  determine  the  quality  and   subsidies, and monitoring  systems.  In China, the
                                                                                                     43
                   stability  of  waste  material  flows  through  on-site   “14   5-year  Plan  for the  Construction  Industry”  also
                                                                       th
                   sorting, labor management, and project planning.  outlines a similar development direction, emphasizing
                (ii)  Recycling enterprises convert waste into marketable   coordinated governance of solid waste between related



                Volume 22 Issue 5 (2025)                       102                           doi: 10.36922/AJWEP025120080
   103   104   105   106   107   108   109   110   111   112   113