Page 137 - {PDF Title}
P. 137

Efficient energy management in microgrid

                               A                                   B










                                     Figure 13. Electric powers for 24-h period: (A) PV, and (B) WT
                                           Abbreviations: PV: Photovoltaic; WT: Wind turbine.


                 Table 5. REEM simulations of MGs under             methodology  in  microgrid  REEM  applications  and
                 probabilistic scenario                             features its better exhibition.
                                                                       This paper exhibits the adequacy of ZOA in tending
                 Parameter                 Without    With RERs     to  difficulties  with  REEM  in  microgrids,  providing
                                            RERs
                 The energy losses (kWh)  1.45688×10 5  9.8650×10 4  evidence  for its capability  in streamlining  microgrid
                                                                    tasks and its viability in deterministic and probabilistic
                 The procurement energy   3.45787×10 6  2.9501×10 6  situations. This features ZOA’s strength and flexibility
                 from the substation (kWh)                          in upgrading microgrid execution.
                 Optimization size of         0          386           Ideal reconciliation of RERs into smart EM system
                 the PV unit (kW)                                   (SEMS)  has  decreased  by  52%  in  general  expense
                 Optimization size of the WT   0          60        under  deterministic  settings.  Simultaneously, the
                 Overall Cost of         8.74149×10 3  5.18867×10 3  absolute  voltage  profile  has  fundamentally  dropped
                 energy loss ($)                                    by  7.4949%.  A  critical  63.68%  decrease  in  general
                 Cost of procurement     3.54878×10 6  2.0951×10 6  expense is accomplished  in a probabilistic  situation
                 energy ($)                                         by tending to SEMS through effective fusion of RERs.
                 Cost PV ($)                  0       4.83465×10 4  Simultaneously, the total voltage stability index has
                 Cost of Wind turbine ($)     0       2.47426×10 4  improved by 7.51 %.
                 Total cost ($)           3.5575×10 6  2.17337×10 6
                 Abbreviations: REEM: Resource efficient energy management;   Acknowledgments
                 RER: Renewable energy resources; MGs: Microgrids; PV:
                 Photovoltaic; RERs: Renewable energy resources; WT: Wind   None.
                 turbine.
                                                                    Funding
                5. Conclusion
                                                                    None.
                In  this  work,  a  challenge  of  REEM  in  a  microgrid
                was addressed by consolidating  PV and  WT power    Conflict of interest
                frameworks  in  the  most  successful  way.  Under
                deterministic  and  probabilistic  situations,  the  ZOA  –   The  authors  declare  that  they  have  no competing
                a  compelling  streamlining  strategy  –  was  utilized  to   interest.
                analyze changes sought after for loads, wind speed, PV,
                and market costs. The proposed ZOA approach further   Author contributions
                develops the voltage and cost profiles simultaneously
                following an attempt  on developing  a 12-transport   Conceptualization: Dodda Aasha Vardhini
                microgrid  framework.  An  examination  was  made   Investigation: Dodda Aasha Vardhini
                between  the  ZOA  calculation’s  result  and  those  of   Methodology: Jayaram Nakka
                MFOA  and  SFSN.  This  examination  adds  as  far  as   Writing–original draft: Dodda Aasha Vardhini
                anyone  is  concerned  of  the  advantages  of  the  ZOA   Writing–review & editing: Jayaram Nakka







                Volume 22 Issue 1 (2025)                       131                           doi: 10.36922/AJWEP025050030
   132   133   134   135   136   137   138   139   140   141   142