Efficient energy management in microgrid

                              A                                  B










                                Figure 4. Voltage profiles of a microgrid: (A) Without RER (B) With RER
                                             Abbreviation: RER: Renewable energy resource.
















                         Figure 5. Active power loss (kW)           Figure 8. Objective function for MFOA, SFSN, and
                  Abbreviation: RERs: Renewable energy resources.   ZOA
                                                                    Abbreviations: MFOA: Moth-flame optimization
                                                                    algorithm; SFSN: Stochastic fractal search network;
                                                                    ZOA: Zebra optimization algorithm.












                            Figure 6. PV power profile
                          Abbreviation: PV: Photovoltaic.


                                                                    Figure  9.  Forecasting  of  load  profile  under
                                                                    probabilistic conditions

                                                                    which includes wind speed, solar power, and energy
                                                                    demand, is presented. Data on hourly energy demand,
                                                                    sunlight, and wind speed from 3 years are available for
                                                                    study. Wind speed, PV, and the heap profile are displayed
                                                                    in  Figures  9 and  10, respectively.  Table  5  shows  the
                                                                    acquired ideal REEM results involving ZOA strategy
                      Figure 7. Active power of wind profile        in both the situations  when RERs are incorporated
                          Abbreviation: WT: Wind turbine.           and without even a trace of them. Without RERs, the
                                                                    general expense, absolute energy (kWh), and the cost of
                4.2. Microgrid REEM in a probabilistic scenario     procurement energy from the substation are $3,557,500,
                In this work, a method for managing microgrid REEM,   $145,688, and $3,548,780, respectively. Taking RERs







                Volume 22 Issue 1 (2025)                       129                           doi: 10.36922/AJWEP025050030