Page 146 - IJOCTA-15-2
P. 146

End of day process optimization
                                                                             ¨
            Author contributions                               9. Ulusoy G, Ozdamar L. Heuristic performance
                                                                  and network/resource characteristics in resource-
            Conceptualization: All authors
                                                                  constrained project scheduling. J Oper Res Soc
            Formal analysis: Ezgi Karabulut T¨urkseven, Ezgi
                                                                  1989;40:1145-1152.
            Gen¸c                                                 https://doi.org/10.1057/jors.1989.196
            Methodology: Ezgi Karabulut T¨urkseven            10. Lawrence  S.  Resource  constrained  project
            Project administration: Ilgın S¸afak                  scheduling-A  computational  comparison  of
            Software: Ezgi Karabulut T¨urkseven, Ezgi Gen¸c       heuristic scheduling techniques. In:  Technical
            Writing – original draft: Ezgi Karabulut T¨urk-       Rep. Graduate School of Industrial Administra-
            seven, Ilgın S¸afak                                   tion And Carnegie-Mellon Univ; 1985.
            Writing – review & editing: Ilgın S¸afak          11. Kolisch R. Efficient priority rules for the resource-
                                                                  constrained project scheduling problem. J Oper
            Availability of data                                  Manag 1996;14:179-192.
                                                                  https://doi.org/10.1016/0272-6963(95)00032-1
                                                                  ¨
            All the data is included in the paper.            12. Ozdamar L, Ulusoy G. An iterative local con-
                                                                  straints based analysis for solving the resource
            References
                                                                  constrained project scheduling problem. J Oper
              1. Cetin K, Tuzkaya G, Vayvay O. A mathemati-       Manag 1996;14:193-208.
                cal model for personnel task assignment problem   https://doi.org/10.1016/0272-6963(95)00015-1
                and an application for banking sector. Int J Optim  13. Ulusoy G, Ozdamar L. A constraint-based per-
                Control Theor Appl (IJOCTA) 2020;10:147-158.      spective in resource constrained project schedul-
                https://doi.org/10.11121/ijocta.01.2020.00825     ing. Int J Prod Res 1994;32:693-705.
                                                                  https://doi.org/10.1080/00207549408956961
              2. Malcolm D, Roseboom J, Clark C, Fazar W. Ap-
                                                              14. Kolisch R, Hartmann S. Heuristic algorithms for
                plication of a technique for research and develop-  the resource-constrained project scheduling prob-
                ment program evaluation. Oper Res 1959;7:646-     lem: Classification and computational analysis.
                669.
                                                                  Springer; 1999.
                https://doi.org/10.1287/opre.7.5.646
                                                                  https://doi.org/10.1007/978-1-4615-5533-9 7
              3. Kon´e, O., Artigues C, Lopez P, Mongeau      15. Kolisch R, Hartmann S. Experimental inves-
                M. Comparison of mixed integer linear pro-        tigation of heuristics for resource-constrained
                gramming models for the resource-constrained      project scheduling: An update. Eur J Oper Res
                project scheduling problem with consumption       2006;174:23-37.
                and production of resources. Flex Serv Manuf J    https://doi.org/10.1016/j.ejor.2005.01.065
                2013;25:25-47.                                16. Hartmann S, Briskorn D. An updated sur-
                https://doi.org/10.1007/s10696-012-9152-5         vey of variants and extensions of the resource-
                                                                  constrained project scheduling problem. Eur J
              4. Christofides N, Alvarez-Vald´es R, Tamarit J.
                                                                  Oper Res 2022;297:1-14.
                Project scheduling with resource constraints: A
                                                                  https://doi.org/10.1016/j.ejor.2021.05.004
                branch and bound approach. Eur J Oper Res
                                                              17. Li K, Willis R. An iterative scheduling technique
                1987;29:262-273.
                                                                  for resource-constrained project scheduling. Eur
                https://doi.org/10.1016/0377-2217(87)90240-2
                                                                  J Oper Res 1992;56:370-379.
              5. Artigues C, Michelon P, Reusser S. Insertion     https://doi.org/10.1016/0377-2217(92)90320-9
                techniques for static and dynamic resource-   18. Valls V, Ballestin F, Quintanilla S. A hybrid
                constrained project scheduling. Eur J Oper Res    genetic algorithm for the resource-constrained
                2003;149:249-267.                                 project scheduling problem. Eur J Oper Res
                https://doi.org/10.1016/S0377-2217(02)00758-0     2008;185:495-508.
                                                                  https://doi.org/10.1016/j.ejor.2006.12.033
              6. Alvarez-Valdar´es R, Tamarit J. Heuristic algo-
                                                              19. Lee J, Kim Y. Search heuristics for resource
                rithms for resource-constrained project schedul-
                                                                  constrained project scheduling. J Oper Res Soc
                ing. In: Advances In Project Scheduling. Elsevier;
                                                                  1996;47:678-689.
                1989: l34-143.
                                                                  https://doi.org/10.1057/jors.1996.79
              7. Boctor F. Some efficient multi-heuristic proce-  20. Talbot F. Resource-constrained project schedul-
                dures for resource-constrained project scheduling.  ing with time-resource tradeoffs: The nonpreemp-
                Eur J Oper Res 1990;49:3-13.                      tive case. Manag Sci 1982;28:1197-1210.
                https://doi.org/10.1016/0377-2217(90)90116-S      https://doi.org/10.1287/mnsc.28.10.1197
                 ¨
              8. Ozdamar L, Ulusoy G. A local constraint based  21. Patterson J, Slowinski R, Talbot F, Weglarz J.
                                                                  An algorithm for a general class of precedence
                analysis approach to project scheduling under
                                                                  and resource constrained scheduling problems.
                general resource constraints. Eur J Oper Res
                                                                  Advances In Project Scheduling 1989;3-28.
                1994;79(2):287-298.
                                                                  https://doi.org/10.1016/B978-0-444-87358-
                https://doi.org/10.1016/0377-2217(94)90359-X
                                                                  3.50005-5
                                                           341
   141   142   143   144   145   146   147   148   149   150   151