Page 147 - IJOCTA-15-2
P. 147

E. Karabulut T¨urkseven, E. Gen¸c, and I. Safak / Vol.15, No.2, pp.330-342 (2025)

             22. Sprecher A, Hartmann S, Drexl A. An exact algo-  32. Weglarz J, Jozefowska J, Mika M, Waligora G.
                rithm for project scheduling with multiple modes.  Project scheduling with finite or infinite number
                Oper Res Spektrum 1997;19:195-203.                of activity processing modes-A survey. Eur J Oper
                https://doi.org/10.1007/BF01545587                Res 2011;208:177-205.
             23. Hartmann S, Drexl A. Project scheduling with     https://doi.org/10.1016/j.ejor.2010.03.037
                multiple modes: A comparison of exact algo-
                                                              Ezgi Karabulut T¨urkseven works as an assistant
                rithms. Networks:  An International Journal
                                                              professor at Sabanci University Industrial Engineering
                1998;32:283-297.
                                                              program. Her BSc and MSc degrees are from Bo˘gazi¸ci
                https://doi.org/10.1002/(SICI)1097-
                                                              University Industrial Engineering department, and
                0037(199812)32:4¡283::AID-NET5¿3.0.CO;2-I
                                                              she received her PhD in OR from Georgia Institute
             24. Sprecher A, Drexl A. Multi-mode resource-
                                                              of Technology. With her background in operations re-
                constrained project scheduling by a simple, gen-
                                                              search, her recent work focuses on machine learning
                eral and powerful sequencing algorithm. Eur J
                                                              and optimization.
                Oper Res 1998;107:431-450.
                                                                 https://orcid.org/0000-0001-8642-7715
                https://doi.org/10.1016/S0377-2217(97)00348-2
             25. Boctor F. A new and efficient heuristic for
                                                              Ezgi Gen¸c is a Senior Analyst at Dcipher Analyt-
                scheduling projects with resource restrictions
                                                              ics in Istanbul, Turkey. She received both her BSc
                and multiple execution modes. Eur J Oper Res
                                                              (2019) and MSc (2021) degrees in Industrial Engi-
                1996;90:349-361.
                                                              neering from Sabanci University. During her studies,
                https://doi.org/10.1016/0377-2217(95)00359-2
                                                              she gained practical experience through internships at
             26. Boctor F. Resource-constrained project sched-
                                                              NielsenIQ, Allianz, and BMC. Since joining Dcipher
                uling by simulated annealing. Int J Prod Res
                                                              Analytics in 2021, she has been involved in conducting
                1996;34:2335-2351.
                                                              in-depth data analysis, contributing to international
                https://doi.org/10.1080/00207549608905028
                                                              projects, and deriving actionable insights. Her main
             27. Bouleimen K, Lecocq H. A new efficient simulated
                                                              research interests include statistics, machine learning,
                annealing algorithm for the resource-constrained
                                                              and AI applications.
                project scheduling problem and its multiple mode
                                                                 https://orcid.org/0000-0001-6815-4207
                version. Eur J Oper Res 2003;149:268-281.
                https://doi.org/10.1016/S0377-2217(02)00761-0
                                                              Ilgın S¸afak is an Expert Researcher at Fibabanka’s
             28. Jozefowska J, Mika M, Rozycki R, Waligora
                                                              R&D Center in Istanbul, Turkey and a Postdoctoral
                G, Weglarz J. Simulated annealing for multi-
                                                              Researcher at the University of Jyv¨askyl¨a, Finland.
                mode resource-constrained project scheduling.
                                                              She received her MSc and PhD degrees in 2006 and
                Ann Oper Res 2001;102:137-155.
                                                              2013 respectively, in Electrical and Electronics En-
             29. Mori M, Tseng C. A genetic algorithm for multi-
                                                              gineering from Hacettepe University in Turkey. She
                mode resource constrained project scheduling
                                                              worked as a Product Manager in Product Develop-
                problem. Eur J Oper Res 1997;100:134-141.
                                                              ment and Innovation at Mastercard Payment Trans-
                https://doi.org/10.1016/S0377-2217(96)00180-4  action Services Turkey in Istanbul, Turkey between
                 ¨
             30. Ozdamar L. A genetic algorithm approach to   2013 and 2016. She worked as a Manager in Product
                a general category project scheduling problem.  Development and Innovation at Mastercard in Pur-
                IEEE Trans Syst Man Cybern C (Applications    chase, NY from 2016 until 2018. She worked as a
                And Reviews) 1999;29:44-59.                   Solution Engineer from 2019 until 2020 at HAVEL-
                https://doi.org/10.1109/5326.740669           SAN, Turkey. She has been working at Fibabanka since
             31. Alcaraz J, Maroto C, Ruiz R. Solving the Multi-  2020. She published 27 articles and has filed 11 patent
                Mode Resource-Constrained Project Scheduling  applications. Her research interests are in cyberse-
                Problem with genetic algorithms. J Oper Res Soc  curity, distributed ledger technology, artificial intelli-
                2003;54:614-626.                              gence/machine learning, and the internet of things.
                https://doi.org/10.1057/palgrave.jors.2601563    https://orcid.org/0000-0002-2788-7276
                            An International Journal of Optimization and Control: Theories & Applications
                                             (https://accscience.com/journal/ijocta)
            This work is licensed under a Creative Commons Attribution 4.0 International License. The authors retain ownership of
            the copyright for their article, but they allow anyone to download, reuse, reprint, modify, distribute, and/or copy articles
            in IJOCTA, so long as the original authors and source are credited. To see the complete license contents, please visit
            http://creativecommons.org/licenses/by/4.0/.




                                                           342
   142   143   144   145   146   147   148   149   150   151   152