Page 46 - DP-2-2
P. 46

Design+                                                          EV charging capacity through queuing model



              ρ <ρ<1                                  (XIII)   gross national product expressed in monetary terms; T  is
               t
                                                                                                           G
            (B)  Waiting time limit                            the work hours of the laborer; N  is the number of workers;
                                                                                        P
                                                               and T =D×T /5, where D is the number of working days in
                                                                         w
                                                                   G
              We need to consider not only the return on investment   the year; and T  is the average weekly working hours.
            for the investor and the equipment utilization but also the    w
            reasonability of the queuing time. Thus, the efficiency of   The gross domestic product and other data of Hohhot
            CSs and user satisfaction needs to reach a good balance.   City in 2022, as shown in Table 2, were obtained from the
            Through queuing  theory, we can calculate the average   Hohhot City 2023 Statistical Yearbook.
            queuing time and charging time under different numbers   Substituting the data in Table 2 into Equation XVI, the
            of charging terminals, directly reflecting the efficiency of   average user time cost in Hohhot in 2022 can be obtained
            users waiting for charging. For users, a long waiting time   as 86.85 yuan by the production method.
            will seriously affect their experience and satisfaction. To   The parameters of the public fast-charging capacity
            ensure that the queuing time of users is not too long, we   optimization model are set as follows. The operating life
            need to introduce a limit. The waiting time should be set to   of the station r is set to 10 years. The discount rate d is set
            less than the maximum queuing time, as in Equation XIV.   at 5%. The charging facilities of the public fast-CS adopt
            This maximum queuing time can be determined based on   split charging equipment, including high and low voltage
            the user’s needs, behavioral habits, and expectations of the   integrated charging box transformer and charging terminal.
            charging service.
                                                               The price of 800 kVA charging box-type transformer c
                                                                                                            xb
              W ≤W                                   (XIV)     is 520,000 yuan. The unit price of the charging terminal
                s   t
              Taking into account the above analysis of the objective   c  is 6,000 yuan. The land cost of the public fast CS c  is
                                                                zd
                                                                                                          td
            function and constraints, the public fast-CS capacity   2 million yuan. The construction cost of the station c  is
                                                                                                           js
            optimization model can be expressed as Equation XV.  100,000 yuan. The annual inspection and maintenance
                                                               cost of each terminal c  is 1,000 yuan. The distribution
                                                                                  wh
                              F
               min  k  = γ F  1 ik  + γ F  2 tk               cost per unit capacity α is 5000 yuan/kVA, and the load
               
                                                              ratio of the transformer is set to 80%. The distribution cost
                st  ρ  . .    t  ρ <  <  1,  s  ≤  W  W t  (XV)  of the charging box transformer c  can be calculated to
                                                                                           pd
                                                               be 5 million yuan. The battery capacity of the EV q is set
            2.5. Case analysis                                 to 60 kWh and the maximum queuing time that EV users
            We collected data about the operation of a public fast-CS   can tolerate is set to 10 min. The time cost for EV users is
            in Hohhot. The time distribution of the arrival process and   86.85 yuan/h. Since there is a land cost for this station, the
            service process of the charging service system of this fast-CS   weighting factor is set to γ  = 0.6, γ  = 0.4.
                                                                                           2
                                                                                    1
            has been analyzed as described in Section 2.2. It is known   The facility utilization rate of a public CS is calculated
            that the arrival interval time obeys a negative exponential   as ρ = λ/μs. For the charging service system not to form
            distribution with parameter 9.47, so the number of vehicles   an infinite queue, ρ should be ≤1. Substituting the values
            arriving at the CS per unit time is λ = 0.106. The charging   of λ and μ, s = 5.06, the minimum number of charging
            duration obeys a normal distribution with parameter   terminals in the public fast-CS is determined as 6. The
            47.25; then the number of vehicles that can be served per   facility utilization rate of the public fast-CS ρ should be
            unit time is μ = 0.021.                            greater than a certain minimum value  ρ  to ensure the
                                                                                                 t
              The production method is a method of determining the   sustainable operation of the CS. By setting  ρ   = 0.3, the
                                                                                                    t
            cost of time based on the value that the traveler can create.   maximum number of charging terminals in the public fast
            The production method assumes that travelers are engaged   CS is determined as 16.
            in productive activities if they are not waiting. They can   When the number of charging terminals is >13, the
            create national income or gross national product. In the   charging power allocated to a single charging terminal will
            queuing theory model, when considering the time cost of   be <60 kW, which means that the charging time for EVs will
            EV users, it is a common method to use the production
            method, which is calculated as in Equation XVI.    Table 2. Statistical data of Hohhot in 2022
                     P                                         Year Employment  Gross domestic   Weekly   Number
               W p  = T G  ×N P                      (XVI)          number    product     working hours  of working
                      G
                                                                                                       days
              In the formula, W  is the cost per unit of time to the user   2022 1.574 million  332910.46   48.9 h  249 days
                            p
            calculated according to the production method; P  is the   people  million yuan
                                                    G
            Volume 2 Issue 2 (2025)                         9                                doi: 10.36922/dp.4225
   41   42   43   44   45   46   47   48   49   50   51