Municipal street lighting retrofit in Bulgaria

                 Table 6. Type, rated power, and number of luminaires in the modernized street lighting systems
                 Town      Flood-                 Road type luminaires                Park type    Total      Total
                           lights                                                     luminaires  number    installed
                            LED                  LED power, W                  Total   CFL  LED   of street   electrical
                          power, W                                            number              and park  power, W
                            120    10.8  16.6  20.5 22 25 28.5 34.5 41 50              23   14.4  luminaires
                 Pavlikeni   16     78   807   113  36 61   77    59  50 28    1,325   -    52     1,377     29,221
                 Byala       -       -   369    -    -   -  85    -    -   -   454     43    -      497       9,537
                 Cherkva
                 Total       16     78   1,176  113  36 61 162    59  50 28    1,779   43   52     1,874     38,758
                 Abbreviation: LED: Light-emitting diode.

                                                                    3. Evaluation of energy efficiency, financial
                                                                    savings, and environmental benefits of the
                                                                    proposed modernization


                                                                    The calculations were prepared in connection  with
                                                                    the main objective of the current investment working
                                                                    project—an  application  submitted  by  Pavlikeni
                                                                    municipality  under   the   program   “Renewable
                                                                    Energy,  Energy  Efficiency,  Energy  Security”  of  the
                                                                    European  Economic  Area Financial  Mechanism
                                                                    2014–2021, Procedure No. BGENERGY-2.001, titled
                                                                    “Rehabilitation  and Modernization  of Municipal
                                                                    Infrastructure—Systems for Outdoor Artificial Lighting
                Figure  12.  Existing  power  supply  box  for  street   in Municipalities.” The calculated energy and economic
                lighting  with  outdated  protective  and  switching   indicators were comparable  to those used in energy
                equipment                                           efficiency projects by leading researchers. 35-37
                                                                       In Bulgaria, the mandatory state regulation
                                                                    Ordinance No. E-RD-04-3 of May 4, 2016, titled
                                                                    “On eligible measures for the implementation
                                                                    of  energy  savings  in  final  consumption,  methods
                                                                    for demonstrating the energy savings achieved,
                                                                    requirements for assessment methodologies, and
                                                                    means  of  confirmation,”  is in force, according to
                                                                                           23
                                                                    which specialized methodologies, approved by the
                                                                    Bulgarian Sustainable Energy Development Agency,
                                                                    must be employed.

                                                                    3.1. Energy and carbon dioxide savings calculations
                                                                    The methodology for energy and CO  savings calculations,
                                                                                                   2
                                                                    according to the national regulatory document , includes
                                                                                                            38
                Figure  13.  Modern  control  cabinet  for  street   the sequential calculation of final energy savings at an
                lighting  with  integrated  global  system  for  mobile   end-user site (FEStot) (Equation IX), primary energy
                communications/general  packet  radio  service      savings at an end-user site (PEStot) (Equation X), and
                communication and monitoring                        CO  emission reductions (Equation XI).
                                                                       2






                Volume 22 Issue 6 (2025)                       191                           doi: 10.36922/AJWEP025310242
   192   193   194   195   196   197   198   199   200   201   202